Exterior of Treehouse is Complete
We have finally gotten to the point where the exterior of the treehouse is complete. The remaining portion of the handrail on the crow's nest was added, the scaffolding has been removed, electrical wiring has been put in the walls, and the final window has been installed.
We have started on the interior. The ceiling has been sheetrocked, spackled, sanded primed and painted. The cedar panelling has been almost completely installed.
The only remaining items on the checklist are:
Finish panelling
Install flooring
Make and install door
Install light fixtures.