Tuesday, May 22, 2018

Finishing up the Finishing Touches

I have just completed the following items:

1.  Finished installing the plywood sub flooring inside the tree house.
2.  Installed the plank hardwood flooring.
3.  Installed the trim baseboards around the perimeter of the flooring.
4.  Installed the stop molding and weatherstripping for the door.
5.  Installed a few more pieces of trim molding on the walls where the tree limbs protrude through the walls. Ditto on a few of the corners.

I have built the saddle for the door, but I have not installed it. I must first cut off the bottom of the door to make enough room for it. I have also not completed the latch mechanism for the door or stained the door either.

I brought the rope trundle bed up to the tree house to see how it would fit.  Unfortunately, it is about 2" too long for it to fit in the alcove between the main tree and the end wall.  I will construct a smaller platform and put in a piece of foam for a mattress.  That is areal shame. I have been looking for years to find a place for this bed from the early 1800s.

We have to clean up all the dust throughout the tree house and in the deck area and complete the touch up painting.  Also, I have to tighten up the rungs on the various ladders.

Pictures to follow.  It is difficult to take pictures inside the tree house.